Do You Need a Consumer Unit Upgrade in Sandwell?

An older or fully-loaded consumer unit (your fuse box) is one of the most common reasons an EV charger quote comes in higher than expected. Here's how to tell before you book a survey.

Get matched with Sandwell installers
A lime green electric car plugged in and charging, as seen across Sandwell

Signs you might need an upgrade

None of these are a guaranteed yes or no on their own; an installer needs to see the unit itself. That's exactly what the photo survey is for, so you get a real answer rather than a guess.

What it costs

A consumer unit upgrade typically runs £400–£800 on top of the standard installation cost, depending on the scope of work and any additional circuits needed.

Consumer unit age is the recurring theme on Sandwell quotes. An older board at capacity may need upgrading before a charger can be added, and that is worth knowing before you order a unit rather than after.

Why this comes up in Sandwell

Sandwell is a borough of six towns — West Bromwich, Oldbury, Smethwick, Tipton, Wednesbury and Rowley Regis — rather than a single centre, and the housing stock differs noticeably between them.

An EV charger is a substantial continuous load and needs its own protected circuit, so the board has to have both the capacity and the protection for it. Where it does not, bringing it up to standard is a requirement rather than an optional extra.

Not sure if your consumer unit needs work?

Upload a photo as part of the survey and installers will tell you plainly, before you commit to anything.

Get matched with Sandwell installers