Home EV charger installation in the West Midlands

Answer a few questions, upload a few photos, and get quotes from local installers. No call centre, no obligation.

Get my free quotes

Free. About 3 minutes. Your details only go to installers covering your postcode.

A home EV charger on a brick wall, with the cable plugged into a carUp to 3 local installers per enquiry

How it works

  1. 1Answer a few questions

    Tell us about your home, where you park and where your fuse box is. That's the box of switches that controls the power in your home.

  2. 2Upload a few photos

    A quick look at the parking spot and fuse box saves a site visit.

  3. 3Compare quotes

    Up to 3 local installers covering your postcode get in touch.

Areas we cover

Pick a West Midlands town to start a quote.

Typical install costs

Most standard 7kW jobs in the UK fall in this range. Your quote depends on wiring, parking and your fuse box.

Standard 7kW install

Short cable run, modern consumer unit

£800 – £1,200

Complex install

Longer cable run or awkward routing

£1,300 – £1,800

Additional work if needed

Groundworks

Trenching add-on, if needed

£200 – £500

Consumer unit upgrade

Only if the board needs bringing up to standard

£400 – £800

Who you're dealing with

  • Only local installers see your detailsUp to 3, and only those covering your postcode.
  • It costs you nothingInstallers pay us for introductions. It never changes the price you are quoted.

Are you eligible for a grant?

In April 2022 the government changed who can get help towards a home EV charger. If you own your home and have your own driveway, you can no longer claim it, which still catches a lot of people out. Here's who can:

May qualifyRenters and flat owners

Can claim up to £500 per socket toward installation, claimed on your behalf by an OZEV-approved installer.

Not eligibleHomeowners with a private driveway

The original homeowner grant (EVHS) closed in April 2022. Full installation cost applies, though salary sacrifice schemes can reduce the effective price if available through your employer.

May qualifyOn-street parking only

May qualify for a cross-pavement solution grant where an approved installation route exists locally.

May qualifyLandlords

Can claim the grant across up to 200 sockets under the residential landlord scheme.

Common questions

Do I need planning permission for a home EV charger?

Most home installations don't need planning permission, as EV chargers are usually covered under permitted development rights. Listed buildings and some conservation areas are exceptions worth checking with your local council.

Can I install a charger without a driveway?

It depends on your parking situation. On-street parking with an approved cross-pavement solution can qualify for a grant, but running a cable across a public pavement without an approved method isn't permitted for safety reasons.

How long does installation take?

A standard install with no groundworks or consumer unit upgrade typically takes 2-4 hours. Jobs involving trenching or an electrical upgrade can take a full day.

What's the difference between a 7kW and 22kW charger?

7kW is the standard for UK homes on a single-phase supply and gives a full overnight charge for most cars. 22kW needs a three-phase supply, which most homes don't have, and is rarely worth the upgrade cost for home use.

Do I need an OZEV-approved installer?

Only if you want to claim a grant. The grant can't be claimed without one, so it's worth confirming installer accreditation before booking if you think you're eligible.