EV Charger Installation in Solihull
Get matched with vetted local installers covering Solihull and Shirley, Dorridge, Knowle. Upload a couple of photos, get a proper quote, no cold calls.
Get matched with Solihull installers
Solihull's larger driveways generally make for simpler installs, though older properties near the town centre sometimes need a consumer unit upgrade.
What installs look like in Solihull
Much of the borough is interwar and post-war suburban housing with off-street parking, which is close to the ideal case for a home charger. The older village cores at Knowle and Dorridge are the exception.
Because off-street parking is common here, Solihull quotes more often come down to cable run length across a larger plot than to whether an install is possible at all.
Typical EV charger costs in Solihull
Standard 7kW install
Short cable run, modern consumer unit
£800 – £1,200
Complex install
Longer cable run or awkward routing
£1,300 – £1,800
Additional work if needed
Groundworks
Trenching add-on, if needed
£200 – £500
Consumer unit upgrade
Only if the board needs bringing up to standard
£400 – £800
Related: see the full Solihull cost breakdown or check whether your property needs a consumer unit upgrade.
Are you eligible for a grant?
In April 2022 the government changed who can get help towards a home EV charger. If you own your home and have your own driveway, you can no longer claim it, which still catches a lot of people out. Here's who can:
Can claim up to £500 per socket toward installation, claimed on your behalf by an OZEV-approved installer.
The original homeowner grant (EVHS) closed in April 2022. Full installation cost applies, though salary sacrifice schemes can reduce the effective price if available through your employer.
May qualify for a cross-pavement solution grant where an approved installation route exists locally.
Can claim the grant across up to 200 sockets under the residential landlord scheme.
Planning permission and your council
Most home chargers in Solihull fall under permitted development and need no planning application. The exceptions are listed buildings and some conservation areas, and anything that crosses a public pavement. For Solihull, the authority for both planning and highways questions is Solihull Metropolitan Borough Council.
Covering Solihull and nearby areas
Our Solihull installer partners also cover Shirley, Dorridge, Knowle, Olton, and the wider B90, B91, B92, B93 postcode areas.
Running a business instead? Workplace and commercial EV charging in Solihull.
Common questions about EV chargers in Solihull
My Solihull property is in a conservation area. Does that change anything?
It can. Permitted development rights cover most home chargers, but conservation areas and listed buildings are the usual exceptions, particularly where the unit would be visible from the road. Knowle, Dorridge and Berkswell all contain conservation areas, so it is worth a quick check with Solihull Metropolitan Borough Council before ordering.
Can the charger go on the garage rather than the house?
Usually yes, and on larger Solihull plots it is often the neater option. The cost driver is whether the garage already has an adequate supply of its own or needs a new feed running from the house consumer unit.
Do I need planning permission for a home EV charger?
Most home installations don't need planning permission, as EV chargers are usually covered under permitted development rights. Listed buildings and some conservation areas are exceptions worth checking with your local council.
Can I install a charger without a driveway?
It depends on your parking situation. On-street parking with an approved cross-pavement solution can qualify for a grant, but running a cable across a public pavement without an approved method isn't permitted for safety reasons.
How long does installation take?
A standard install with no groundworks or consumer unit upgrade typically takes 2-4 hours. Jobs involving trenching or an electrical upgrade can take a full day.
What's the difference between a 7kW and 22kW charger?
7kW is the standard for UK homes on a single-phase supply and gives a full overnight charge for most cars. 22kW needs a three-phase supply, which most homes don't have, and is rarely worth the upgrade cost for home use.
Do I need an OZEV-approved installer?
Only if you want to claim a grant. The grant can't be claimed without one, so it's worth confirming installer accreditation before booking if you think you're eligible.
Takes about 3 minutes. No obligation, no pushy sales calls.
Get matched with Solihull installers